Why is it necessary to complete the pre - inspection before the clearance of imported equipment? Professional interpretation and guide to avoid pitfalls
Home?Import Representation? Why is it necessary to complete the pre - inspection before the clearance of imported equipment? Professional interpretation and guide to avoid pitfalls
To prevent second - hand equipment from being declared as new productsand ensure that imported equipment complies with Chinas mandatory technical specifications. Professional agency companies can effectively avoid the risk of tariff losses of over 20% caused by misreporting of HS codes through the pre - inspection process.Four Key Steps of the PSI Process in 2025
Technical Document Pre - review Stage (3 - 5 working days)
Check the consistency between the equipment nameplate and the contract parameters
Confirm the validity period of CE/UL and other certification certificates
On - site Inspection Implementation Stage (Key Monitoring Items)
Detection of actual use traces of the equipment (Infrared Spectral Analysis)
Verification of the integrity of safety protection devices
安全防護(hù)裝置完整性核查
Formulation of Rectification Plan (Handling of Common Issues)
Conversion Plan for Incompatible Voltage Systems
Remedial Measures for Missing Chinese Warning Labels
Issuance of Inspection Report (Obtaining of Clearance Vouchers)
Pre - shipment Inspection Certificate Issued by CCIC
Report of Third - party Testing Institutions Recognized by the Customs
Analysis of Typical Customs Clearance Failure Cases in the Past Three Years
In 2024, when an auto parts enterprise imported German stamping equipment, due to neglectingthe detection of equipment foundation bolt hole positions, it was found that they did not match the factory building embedded parts after arrival at the port, resulting in a renovation cost as high as 15% of the equipment value. The new regulations in 2025 specifically emphasize that the importer needs to provideelectronic filing of the equipment installation foundation drawing, and this case verifies the importance of technical review in the pre - inspection process.
Triple Value Guarantee of Professional Agency Services
Risk Early - Warning System: Identify special certification requirements for equipment origin in advance
Emergency response mechanism: Complete the technical rectification plan within 72 hours
Cost Control Model: Dynamic customs clearance strategy to avoid demurrage charges
Five evaluation dimensions for selecting service providers
It is recommended that enterprises focus on examining theLocalized service capabilityagent companies, especially their familiarity with policies at major import ports such as the Yangtze River Delta and the Pearl River Delta. Agent companies with AEO advanced certification can shorten the customs clearance time by 30%, and at the same time, it is necessary to confirm whether their technical teams include professional personnel such as mechanical engineers.
A precision instrument import enterprise completed the EMC electromagnetic compatibility rectification in advance through professional agency, saving 22 customs clearance working days compared with self - declaration. This case confirmsthe decisive role of technical prediction abilityin equipment import. With the implementation of the Intelligent Document Review system by the customs in 2025, standardized and complete pre - inspection documents will become the core competitiveness for rapid customs clearance.